Priority programming and project selection
More from Synthesis of highway practice
Failure and repair of continuously reinforced concrete pavement
Highway tunnel operations
Bridge bearings
Changeable message signs
Storage and retrieval systems for highways and transportation data
Consequences of deferred maintenance
Bridge drainage systems
Bus route and schedule planning guidelines
Priority programming and project selection
Relationship of asphalt cement properties to pavement durability
Minsik readers
0.0
0 ratings
Other platforms
0.0
0 ratings
31
PAGES~31 min
READING TIMEEnglish
LANGUAGEDescription
The procedures followed in programming (the matching of available projects with available funds to accomplish the goals of a given project) are outlined. The 15-step basic programming process, derived from a review of published documents and interviews with highway administrators, ranges from project initiation through modification. Several steps (e.g. prioritizing and financial analysis) are described in detail, and a list of definitions for the basic terms used in planning and programming is provided.
Detailed Ratings
0.0Emotional Impact
No ratings yet
0.0Intellectual Depth
No ratings yet
0.0Writing Quality
No ratings yet
0.0Rereadability
No ratings yet
0.0Pacing
No ratings yet
0.0Readability
No ratings yet
0.0Plot Complexity
No ratings yet
0.0Humor
No ratings yet